Anatolia Pool & SPA

Bucket Shower

Contact Us

Give Us A Call

+90 (242) 241 0305
+90 (543) 496 9535

Send Us Message

info@anatoliapoolspa.com

Visit Our Location

Bakü Türk Şehitleri Cad. Hüsnü Karakaş Mah. Nihat Bulut Apt. No:14/D Kepez/Antalya

Anatolia Pool & SPA

A staple of the thermal ritual, the bucket shower (drench bucket) rapidly cools the body with a safe shock shower after sauna or steam room sessions. For hotels, spa & wellness venues and luxury villas, we deliver aesthetic, durable bucket shower installation end-to-end—from concept and mounting to drainage and optional automation integration.

What Is a Bucket Shower? Key Benefits

  • Controlled, effective shock shower for post-sauna cooling.
  • Low water consumption, simple operation and minimal maintenance.
  • Premium spa aesthetics with wood/composite or stainless body options.

Bucket Shower Components

  • Bucket body: Heat/moisture-resistant wood, composite or stainless; leak-proof inner surface.
  • Pull handle/chain: Ergonomic actuation; safe clearance to prevent hits and splashback.
  • Supply & float: Float valve for constant level; inline filter and scale-prevention loop.
  • Support bracket: Wall/suspended mounts with stainless anchors and torque settings.
  • Drainage & floor: Sloped floor, fast drainage grate and anti-slip finish.
  • Options: Niche LED accent, pre-warning label, session automation trigger contact.

Bucket Shower Packages — Quick Comparison

Package Contents Recommended Use
Basic Wooden bucket, manual chain, float feed, basic drainage Villas & boutique spas
Pro Composite/stainless bucket, reinforced bracket, scale control, niche LED Hotel spa & fitness
Signature Custom cladding, session automation trigger, safety kit, brand-matched niche Luxury hotels & resorts

Sizing & Installation — Practical Guide

Parameter Recommendation / Range
Bucket volume ≈ 8–15 L (based on user profile)
Mounting height ≈ 2.1–2.4 m (splash safety & impact)
Supply pressure ≈ 2–4 bar (float stability)
Drain capacity Rapid drainage for instant discharge (grate + trap)

We finalise exact values after an on-site survey and review of architectural constraints.

Installation Process

  1. Survey & Concept: Niche/wall analysis, water–electrical and drainage review.
  2. Engineering: Bracket & anchor detailing, supply line and float plan.
  3. Assembly: Bucket, chain/handle, niche LED (optional), warning signage.
  4. Testing & Handover: Leak test, fill-and-dump cycle, user training.