Anatolia is the team that manages the entire journey from idea to handover in pool and Spa & Wellness projects. With project & contracting expertise, we deliver design, engineering, permits–execution, on-site installation and commissioning to standard, transparently and on schedule.

Project & Contracting Scope

  • Project production: Concept–detailed architectural drawings, 3D visuals, constructible details.
  • Engineering: Mechanical (filtration–heatingautomation), electrical and lighting designs.
  • Quantity takeoff & BOQ: Accurate budgeting, material lists, work programme.
  • Installation & assembly: Site coordination, procurement, quality control and HSE.
  • Testing & commissioning: Pressure & leak tests, electrical safety, automation calibration.
  • As-built documentation and user training; post-handover maintenance & service.

Contract Models — Quick Comparison

Model Definition When to Choose?
Turnkey (EPC) Single point for design, installation and commissioning Hotels/sites needing a fixed budget & schedule
Consultancy + Subcontractors Project management by us, shared execution Villas seeking phased budgets and flexible sourcing
Design-Only Architectural & engineering packs, BOQ and specs Tenders or projects with in-house installation teams

Project & Contracting Process

  1. Survey & goals: Site analysis, capacity (villa/hotel/site), budget and schedule.
  2. Concept & design: Architectural schemes, material palette, visuals.
  3. Engineering: Mechanical (filtration–heatingautomation), electrical, hydraulic calculations.
  4. BOQ & proposal: Line-by-line transparent costs; work programme & payment plan.
  5. Installation & assembly: Site coordination, quality control, HSE procedures.
  6. Testing–commissioning: Pressure/leak, electrical safety, commissioning and training.
  7. As-built & handover: Updated drawings, O&M plan, warranty and service.

Standard Deliverables

  • Implementation drawings (PDF/CAD), hydraulic–electrical schematics, detail sheets
  • Specifications and material lists; brand/model equivalents
  • Work programme, checklists and weekly progress reports
  • As-built drawings, user manuals, warranty certificates

Quality & Compliance Policy

  • Compliance with relevant national/international standards (e.g., TS/EN), OEM documentation and instructions.
  • Material traceability, sample approvals and workmanship control forms.
  • Energy-efficient selection of pumps–filters–heating and automation optimisation.
  • Health & safety procedures and provisional acceptance checklists.

Sample Timeline — Villa & Hotel Projects

Phase Duration (ex.) Note
Concept & design 1–3 weeks Depends on scope & scale
Procurement & prep 1–2 weeks Varies with long-lead items
Installation & assembly 2–6 weeks Villa vs hotel scale
Testing–commissioning 3–7 days Training & acceptance