Contact Us
Give Us A Call
+90 (242) 241 0305
+90 (543) 496 9535
Send Us Message
Visit Our Location
Bakü Türk Şehitleri Cad. Hüsnü Karakaş Mah. Nihat Bulut Apt. No:14/D Kepez/Antalya
We deliver end-to-end solutions for hotel pool construction and aquapark pools that balance guest satisfaction and safety. Our concepts and operating plans align with TS EN 15288 (design & operation), EN 1069 (water slide safety) and DIN 19643 (water treatment), together with Türkiye’s Swimming Pool Health Regulations—so you achieve regulatory compliance and an elevated guest experience.
Hotel & Aquapark Pool Scenarios
- Resort Main Pool: High capacity with overflow circulation for premium looks and superior surface skimming.
- Slides & Attraction Pools: Water slide splash-down pools, wave/river pools and themed kids’ play zones.
- Heated Indoor & Spa: Year-round use with heat recovery, dehumidification and quiet operation.
- Kids & Training Areas: Low depth, anti-slip entries, lighting that facilitates easy visual supervision.
Water quality, hygiene and user safety depend on correct hydraulic design, adequate turnover time and properly sized filtration. Turnover time is the period needed for the entire pool volume to pass through the treatment system—a critical benchmark for public pools.
Overflow (Infinity) vs. Skimmer Systems
Under heavy loads, overflow pools provide the best visual result and continuous surface cleaning; in some themed or secondary pools, skimmer systems are the more economical choice. We select the system with you based on capacity, architecture and operating strategy.
```| Criterion | Overflow | Skimmer |
|---|---|---|
| Surface cleaning | Maximum (continuous overflow) | High (skimmer throats) |
| Aesthetics | Premium look | Classic look |
| Operation | Balance tank + extra equipment | Simpler operation |
| Cost | Higher upfront | More economical |
Aquapark: Water Slides & Safety
For water slides, the European standard EN 1069 defines safety requirements for design, manufacture, installation and inspection. We design all slides and splash-down pools to this framework and manage testing and commissioning accordingly.
Pool equipment (ladders, handrails, start blocks, etc.) and overall facility safety are planned and operated under TS EN 15288 and the relevant equipment standards.
Water Quality: DIN 19643 & National Compliance
With high bather loads, robust filtration, disinfection and the right turnover time are essential. DIN 19643 provides the current framework for pool-water treatment and monitoring parameters, while Türkiye’s Swimming Pool Health Regulations govern the minimum requirements for public and semi-public pools. Our designs and operating plans take both into account from the outset.
Technical Design: Filtration, Heating & Automation
- Filtration & Circulation: Pump–filter sizing for heavy use, nozzle layouts without dead zones and turnover targets that match your load profile.
- Disinfection: Automatic dosing, salt electrolysis or hybrid approaches; logging and monitoring for auditability.
- Heating & Energy: Heat pumps, exchangers and solar support; dehumidification and heat recovery for indoor pools.
- Automation & Monitoring: Timed filtration, lighting, level and chemistry control with remote access.
- Safety & Operations: Risk reduction and SOPs aligned with TS EN 15288-1/-2 during design and operation.
Related pages: Filtration & Circulation · Heating Systems · Automation
Hotel/Aquapark Pool Construction Process
- Concept & Masterplan: Pool locations, guest circulation routes, sunbathing and vantage areas.
- Engineering & Design: Architectural, structural and MEP drawings; hydraulic calculations with flows and turnover times.
- Construction: Reinforced-concrete shell, balance tanks/channels, plant rooms and cabling.
- Installation: Pumps, filters, piping, fittings, lighting and automation.
- Testing & Commissioning: Leak tests, filling, chemical balancing, safety checks and staff training.
- Operations: Documented monitoring, periodic maintenance plans and seasonal revisions.
Operations, Maintenance & Record-Keeping
In high-capacity facilities, planned maintenance and record-keeping are mandatory. Sample plan:
| Interval | Tasks |
|---|---|
| Daily | Free chlorine/pH checks, surface skimming, skimmer/channel inspection, log entries |
| Weekly | Vacuum/brush, backwash, balance-tank checks and system leak inspection |
| Monthly | General equipment check, dosing-pump calibration, lighting and safety-equipment tests |
Learn more: Maintenance & Service · Chemical Supply & Dosing · Service Request
Why Anatolia?
- Standards-Compliant Design: Solutions aligned with TS EN 15288, EN 1069 and DIN 19643.
- Guest-Experience Focus: Capacity planning, circulation, shading and acoustic comfort considered together.
- Energy & Opex Efficiency: Variable-speed pumps, heat recovery and smart automation.
- End-to-End Delivery: Survey, design, build, equipment, training and periodic maintenance by one team.
- Local Expertise: Dozens of Antalya references; operating guidance tuned to climate and seasonality.



